← BACK TO SHE DESIGNER
NEW LEAF TOOLS LLC
SELECTIVE HARMONIC ELIMINATION · HYPERSCALE UPS
100 MW DATACENTER · 10-YEAR MODEL
BUILD PHASE Month 0 of 24
CONSTRAINT REMOVAL · BUILD CAPEX
Transformer eliminated$0
UPS BOM (80 units)$0
Building shell freed$0
Steel saved0 t
Copper saved0 t
Lead-time recapture$0
BUILD TOTAL$0
OPERATING SAVINGS · CUMULATIVE
Switching energy$0
Cooling load (PUE 1.4)$0
Transformer iron loss$0
Capacitor deferral$0
VRLA battery deferral$0
Water saved0 gal
10-YR OPS TOTAL$0
LUT FIELD-DEPLOYABILITY · CERTIFIED 80/80 OPERATING POINTS
0.1159°
MAX TRANSITION
22.5 µs
MIN DEAD-TIME
15×
IGBT MARGIN
0.0000%
WORST RESIDUAL
CAPEX RECAPTURED
$0
10-YR OPEX SAVED
$0
10-YR TOTAL VALUE
$0
PROJECT IRR UPLIFT
0.0%